Memorial Hospital West – Bed Expansion Project
- Project Value: $30.7 Million
- Project Size: 71,000 GSF
- Completion Date: November 2011
- Delivery Method: CM/GMP
- Project Manager: Peter Kurszewski
- Superintendent: John Hughes
Scope of Work
The Bed Expansion project at Memorial Hospital West in Pembroke Pines, Florida was the construction of an 4-Story 80 Bed Patient Wing connecting to the existing hospital. This project consisted four floors that were broken up in the following; the fourth floor have standard patient rooms, the third floor has a forty bed bone marrow transplant unit. This unit includes an oncology pharmacy, chemo hood, ante room, two isolation rooms, 99.9% HEPA Filters at each patient room, ICU head-walls at each patient bed, scrubbable acoustic ceiling tile with gasketed grid, epoxy paint on the walls, air tight partitions and patient view windows at all patient rooms.
Project Owner:
Memorial Healthcare System
David Schlemmer, Administrative Director of Construction
2900 Corporate Way, Miramar, Florida 33025
Project Architect:
Gresham Smith & Partners,
6030 Hollywood Blvd., Suite 210,
Hollywood, FL 33024