Central Energy Plant

Memorial Hospital West – Central Energy Plant and Medical Gas Tank Farm
  • Project Value: $12.5 Million
  • Project Size: 21,175 GSF
  • Completion Date: March 2010
  • Delivery Method: CM/GMP
  • Project Manager: Peter Kurszewski, LEED AP
  • Superintendent: James White

 

Scope of Work
The Central Energy Plant and Medical Gas Tank Farm project at Memorial Hospital West included the new construction of a 21,175 GSF addition to the existing Central Energy Plant. The work consisted of site work, selective demolition, concrete/psi joist structure, infill masonry exterior with a stucco finish, miscellaneous metals, finish carpentry, doors, overhead doors, interiors, fire sprinkler, mechanical, plumbing, fuel oil piping, electrical. It was done in several phases so that the new mechanical equipment can be installed prior to the relocation of any existing pieces of equipment. The two projects were built simultaneously.

The equipment in the Central Plant included two new 2.000 kw generators, three new 12,000 gallon, underground fuel storage tanks and two new 600 ton cooling towers.

Project Owner
Memorial Healthcare System
David Schlemmer, Administrative Director of Construction
2900 Corporate Way, Miramar, Florida 33025

Project Architect
Gresham Smith & Partners,
Edward L. Hengtgen Jr.
6030 Hollywood Blvd., Suite 210, Hollywood, FL 33024