MRI Replacement

Coral Springs Medical Center – MRI Replacement
  • Project Value: $578,817
  • Project Size: 2,234 GSF
  • Completion Date: July 2012
  • Delivery Method: Competitive Bid
  • Project Manager: David Trujillo
  • Superintendent: Thomas Manos

 


Scope of Work

The renovation of an existing CT Suite to create a new MRI procedure room and holding area. This scope includes the installation of RF Shielding, new interior finishes and the Structural, Mechanical, Electrical and Plumbing upgrades required for the installation of the new equipment. The most challenging aspect of this project is the requirement for the shared control room, which services an active MRI in the adjacent suite that must remain operational during construction.

Project Owner
Broward Health
Richard Polemeni
303 SE 17th Street, Fort Lauderdale, FL 33316

Project Architect
MGE Architects, Inc.
150 Alhambra Circle, Suite 100
Coral Gables, FL 33134