Oncology and Hematology

Memorial Regional Hospital – 8th Central Interior Design Oncology and Hematology Dept.
  • Project Value: $863,154
  • Project Size: 18,000 GSF
  • Completion Date: In Progress
  • Delivery Method: GMP
  • Project Manager: Luis Senra
  • Superintendent: Eric Weiss

 


Scope of Work

The 8th Central Interior Design Oncology and Hematology Dept. project at Memorial Regional Hospital consists of an upgrade to 18,000 GSF in the existing patient tower. There are a total of 30 patient rooms and the flooring, paint, shower and bathroom tile, cabinetry, wall protection, plumbing and electrical fixtures are all to be removed and replaced with new. There are two patient wings and a nurse’s station included on the floor. The work is phased and the floor will be occupied by patients as the work is being completed.

Project Owner
Memorial Healthcare System
David Schlemmer, Administrative Director Construction
& Property Management
3501 Johnson Street, Hollywood, FL 33021

Project Architect
Saltz Michelson Architects
Fred Dunayer, Project Manager
3501 Griffon Road
Ft. Lauderdale, FL 33312-5444